When multiple contractors divide up site preparation work, builders always face the same scenario: delayed timelines, communication breakdowns, and ultimately, budget overruns. The handoffs between clearing crews, graders, utility installers, and septic teams create natural breaking points where projects stall.
There’s a better way.
A single site preparation contractor handling everything from clearing to final grade eliminates these transition problems. This turnkey method keeps your project flowing smoothly with one point of accountability.
Let’s examine why this approach delivers better results for builders and developers.
What “Turnkey Site Prep” Really Covers

Full-scope turnkey site preparation means one superintendent stays in charge from the first chainsaw cut to the final driveway grade. Instead of coordinating with 4-5 different companies, you get a streamlined process with three main phases:
Phase 1: Initial Site Work
This foundation stage turns raw land into a workable space and addresses everything above and below ground level before any construction begins.
- Clearing trees and vegetation with appropriate equipment for the conditions
- Establishing precise survey points that guide all subsequent work
- Testing soil composition to determine septic requirements and bearing capacity
Phase 2: Infrastructure Preparation
With the site cleared, this critical middle phase establishes the systems that will support your structure and ensure proper regulatory compliance.
- Engineering proper drainage patterns based on topography and building plans
- Submitting complete permit packages to regulatory authorities
- Grading the building pad to precise elevations with GPS-guided equipment
- Installing utility corridors for water, power, and communications
Phase 3: Final Systems & Finishing
The finishing stage focuses on perfecting site conditions and installing the components that make a property functional for eventual occupants.
- Installing septic systems with certified technicians
- Executing finish grading to ensure proper water runoff
- Preparing driveway and access roads with appropriate base materials
But the most significant advantage here is continuity – when one phase completes, the next begins immediately without the typical multi-week gaps between different contractors.
Three Ways Multiple Contractors Impact Your Timeline

Using separate contractors for each phase of site prep costs you more than just coordination headaches. Here’s what the data shows:
Research and field experience consistently show how using separate contractors affects project schedules:
Schedule Gaps Between Transitions
Touchplan’s 12-month study of 321,000 activities found that missed hand-offs between trades were the single biggest source of schedule variance, eclipsing labor and material delays.
From our own experience, transitions between different site prep contractors typically add 5-12 days of downtime per phase change – time that provides zero value to your project
Increased Rework Requirements
When different crews handle different parts of site prep, things get missed. Stakes shift. Grade points don’t match. One team assumes the next will fix it. That’s how rework stacks up and time gets lost.
Studies peg the cost of this kind of rework in the billions every year – and we see it happen all the time on jobs where no one’s steering the whole process.
Administrative Complications
Every contractor has their own system. More vendors means more permits, more invoices, more chances for things to fall through the cracks.
It eats time and slows everything down, and suddenly you’re spending hours chasing signatures and sorting out who said what – instead of moving your build forward.
How Turnkey Contractors Handle Permits, Safety, and Inspections

Site preparation involves numerous regulatory requirements that can significantly impact your timeline. A turnkey contractor manages these obligations under one coordinated system:
Land-Clearing Coverage: We file the Notice of Intent through MyTDEC, pay the acreage fees, and post the required CGP notices at the site entrance.
Storm Water Logs: Crew leaders complete TDEC Form CN-1173 after every rain event and maintain these records on site for the required three years.
Daily Trench Inspections: The superintendent documents slopes, shields, and access per OSHA 1926.651 requirements before work begins each day.
Demolition and Burn Permits: If an old structure stands in the way, we pull Knox County’s demolition and open-air burning permits and file the necessary air-quality forms.
When inspectors arrive on site, all required documentation is organized in a single location, accessible via physical binder or digital QR code. This eliminates the common scenario where critical paperwork is scattered across multiple contractors, leading to failed inspections and costly delays.
Six Questions To Evaluate Your Site Prep Contractor

Before you hire a site prep contractor, ask the questions that reveal whether they’re truly equipped to run the job from start to finish.
1. “Do you hold a Tennessee BC or BC-A/B license?”
State regulations require proper licensing for projects exceeding $25,000. Verification protects you from liability issues.
2. “Who serves as your qualifying agent of record?”
Tennessee law requires a specific individual who has passed the Business & Law examination. Clear identification of this person indicates proper licensing.
3. “What grade tolerances can you achieve with your equipment?”
Professional contractors should maintain ⅛-inch precision using laser-guided systems, which prevents drainage issues and foundation problems.
4. “How frequently do you file construction Notices of Intent?”
Contractors who file permits regularly know the process and the people behind the desk. That kind of familiarity keeps things moving and helps avoid surprises.
5. “May I review your excavation safety documentation?”
OSHA compliance requires daily sign-offs for trench work. A legitimate contractor will maintain these records meticulously.
6. “Can you provide access to recently completed projects?”
Looking at recent work tells you a lot. How clean the site is, whether the grades are right, if the details were handled with care. And when you pair that with the right questions up front, it becomes clear who’s qualified to run the job and who’s not.
Why Builders Save More with a Single Site Prep Team

Bringing in one contractor to handle the entire site prep process isn’t just about convenience. It has a serious financial impact. It cuts delays, reduces management overhead, and keeps the job moving so your budget stays intact and your timeline stays on track.
Faster Construction Timeline: When site preparation concludes weeks earlier than typical schedules, subsequent phases begin sooner. This reduces carrying costs and accelerates revenue generation for the entire project.
Reduced Management Overhead: Builders spend significantly less time coordinating between trades, resolving conflicts, and managing communication. This frees up valuable resources for other aspects of project oversight.
Minimized Rework Expenses: When one team handles the full scope of site work, there’s no confusion about who’s responsible. If something needs fixing, it gets handled—without the blame game or costly do-overs.
Streamlined Inspection Process: With one team managing all permits and compliance, inspections are more likely to pass the first time. That means fewer hold-ups, no chasing down missing forms, and no wasted days waiting on reinspections.
Reliable Scheduling: When site prep finishes on schedule, the trades that follow can plan with confidence. Crews show up when they’re supposed to, materials get delivered on time, and you avoid the ripple effects of last-minute changes.
For builders and developers, these efficiencies translate directly to improved profitability. Each day saved in the construction timeline represents tangible financial benefit through reduced financing costs and faster project completion.
A Better Approach for Your Next Project

Site prep sets the pace for everything that comes after it. When it’s done right (and done by one team) you avoid the stalls, mix-ups, and do-overs that eat up time and money.
If you’re planning a build in Tennessee, we’d be happy to walk the lot, look at your plans, and give you a clear path forward—no strings attached.
Reach out today to schedule a quick site visit. We’ll show you what it looks like to go from raw ground to foundation-ready without the usual delays.